{"id":26996,"date":"2026-11-05T04:08:27","date_gmt":"2026-11-05T04:08:27","guid":{"rendered":"https:\/\/thestrategystory.com\/blog\/?p=26996"},"modified":"2026-11-05T04:08:27","modified_gmt":"2026-11-05T04:08:27","slug":"sse-swot-analysis-in-2026","status":"publish","type":"post","link":"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/","title":{"rendered":"SSE SWOT Analysis in 2026: Strengths, Weaknesses, Opportunities and Threats"},"content":{"rendered":"<p>SSE SWOT Analysis in 2026 uses the 2025 Annual Report to examine regulated electricity networks, renewable generation, financing, policy and infrastructure risks.<\/p>\n<h2>Strengths<\/h2>\n<h3>1. Regulated network asset base<\/h3>\n<p>SSEN Transmission and Distribution operate essential electricity infrastructure. Their combined regulated asset values exceeded \u00a312.9 billion in 2025, offering a basis for long-term allowed revenues.<\/p>\n<h3>2. Diversified electricity portfolio<\/h3>\n<p>Networks, renewable generation, flexible thermal assets and customer solutions have distinct earnings drivers, providing some balance across regulatory and commodity cycles.<\/p>\n<h3>3. Renewables contribution<\/h3>\n<p>SSE Renewables earned \u00a31,038.8 million in adjusted operating profit in 2024\/25, up from \u00a3833.1 million, demonstrating material generation earnings.<\/p>\n<h3>4. Infrastructure delivery record<\/h3>\n<p>The Shetland HVDC link and Viking wind farm illustrate the ability to coordinate generation and transmission investment.<\/p>\n<h3>5. Networks and Renewables earnings mix<\/h3>\n<p>These activities accounted for 87% of adjusted operating profit in 2024\/25, compared with 63% a year earlier.<\/p>\n<p>Related: <a href=\"https:\/\/thestrategystory.com\/blog\/sse-business-model-in-2026\/\">Business Model<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-business-strategy-in-2026\/\">Business Strategy<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/\">SWOT<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-pestel-analysis-in-2026\/\">PESTEL<\/a><\/p>\n<h2>Weaknesses<\/h2>\n<h3>1. Capital intensity<\/h3>\n<p>Adjusted investment reached \u00a32.910 billion in 2024\/25. Projects require substantial funding before generating mature cash flows.<\/p>\n<h3>2. Debt exposure<\/h3>\n<p>Adjusted net debt and hybrid capital rose to \u00a310.187 billion, increasing financing and refinancing considerations.<\/p>\n<h3>3. Reported earnings decline<\/h3>\n<p>Reported operating profit fell to \u00a31.962 billion from \u00a32.608 billion, despite broadly flat adjusted profit.<\/p>\n<h3>4. Weather-dependent generation<\/h3>\n<p>Wind output and offshore construction schedules are sensitive to weather and equipment availability.<\/p>\n<h3>5. Thermal earnings volatility<\/h3>\n<p>Thermal and gas storage adjusted profit fell to \u00a3211.4 million from \u00a3835.3 million as market volatility normalised.<\/p>\n<p>Related: <a href=\"https:\/\/thestrategystory.com\/blog\/sse-business-model-in-2026\/\">Business Model<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-business-strategy-in-2026\/\">Business Strategy<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/\">SWOT<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-pestel-analysis-in-2026\/\">PESTEL<\/a><\/p>\n<h2>Opportunities<\/h2>\n<h3>1. Grid reinforcement<\/h3>\n<p>Electrification and renewable connections require new transmission and distribution capacity, potentially growing regulated assets.<\/p>\n<h3>2. Offshore wind development<\/h3>\n<p>Dogger Bank and other projects can add long-lived generation assets when commissioned successfully.<\/p>\n<h3>3. Flexible system demand<\/h3>\n<p>More variable renewable generation can increase the need for flexible capacity and storage.<\/p>\n<h3>4. Digital grid capabilities<\/h3>\n<p>Monitoring, forecasting and automation may improve reliability and capital efficiency.<\/p>\n<h3>5. Long-term infrastructure investment<\/h3>\n<p>The \u00a317.5 billion investment programme creates opportunities for asset growth, subject to funding and execution.<\/p>\n<p>Related: <a href=\"https:\/\/thestrategystory.com\/blog\/sse-business-model-in-2026\/\">Business Model<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-business-strategy-in-2026\/\">Business Strategy<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/\">SWOT<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-pestel-analysis-in-2026\/\">PESTEL<\/a><\/p>\n<h2>Threats<\/h2>\n<h3>1. Regulatory decisions<\/h3>\n<p>Allowed returns, cost recovery and incentives can change under price controls, affecting expected network economics.<\/p>\n<h3>2. Construction cost inflation<\/h3>\n<p>Equipment, skilled labour and vessels can become more expensive or scarce, delaying projects.<\/p>\n<h3>3. Interest rates and refinancing<\/h3>\n<p>Higher funding costs may pressure returns during heavy investment and debt growth.<\/p>\n<h3>4. Power-price and weather volatility<\/h3>\n<p>Merchant generation and flexible assets are exposed to commodity conditions and output variation.<\/p>\n<h3>5. Planning and environmental constraints<\/h3>\n<p>Permissions, community concerns and biodiversity requirements may delay transmission and generation projects.<\/p>\n<p>Related: <a href=\"https:\/\/thestrategystory.com\/blog\/sse-business-model-in-2026\/\">Business Model<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-business-strategy-in-2026\/\">Business Strategy<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/\">SWOT<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-pestel-analysis-in-2026\/\">PESTEL<\/a><\/p>\n<h3>Financial interpretation<\/h3>\n<p>SSE&#8217;s adjusted operating profit of \u00a32.419 billion was almost unchanged in 2024\/25, but reported operating profit fell to \u00a31.962 billion. Investors should examine the alternative performance measure reconciliation rather than assuming the figures describe identical economics. The combined networks and renewables contribution reached 87% of adjusted profit, while thermal earnings declined as commodity volatility normalised. This demonstrates portfolio rotation but also highlights differences in earnings stability. The \u00a32.910 billion investment programme and \u00a310.187 billion of adjusted net debt and hybrid capital mean that capital allocation and financing are central to the investment case.<\/p>\n<h3>Regulated strength and its limits<\/h3>\n<p>Electricity networks are essential assets with revenues governed by price controls. This can reduce exposure to short-term electricity prices, but returns are not unconditional. Regulators determine allowed revenues, incentives and investment recovery. Cost overruns or delivery failures can reduce economic value even when the asset is needed. SSE must earn returns through efficient construction and reliable operation. A growing regulated asset base is useful only if funding costs and regulatory outcomes allow shareholders to capture adequate value.<\/p>\n<h3>Renewable growth and construction risk<\/h3>\n<p>SSE Renewables delivered higher adjusted operating profit in 2024\/25, and projects such as Dogger Bank offer future capacity. However, offshore development involves vessels, weather, cables, turbines and grid connections. Delays can defer cash flows and increase financing costs. Joint venture interests also mean headline project capacity is not identical to SSE&#8217;s economic ownership. The opportunity is substantial but must be evaluated through commissioned output and returns rather than announced megawatts.<\/p>\n<h3>Funding and portfolio balance<\/h3>\n<p>Large infrastructure programmes often require borrowing before assets begin producing cash. SSE&#8217;s adjusted net debt and hybrid capital increased during 2024\/25, creating sensitivity to financing conditions. Networks can provide longer-term revenue visibility, while generation adds market exposure. The company must manage liquidity, credit metrics and dividend commitments across the construction cycle. Thermal flexibility may support reliability, but its profits can vary sharply. Portfolio balance should be assessed under downside scenarios involving lower wind output, higher interest rates and project delays.<\/p>\n<h3>2026 monitoring priorities<\/h3>\n<p>Key indicators include regulated asset values, network price-control decisions, project commissioning, renewable output, adjusted and reported profit, debt and capital spending. Safety and community engagement matter because infrastructure projects can face serious operational and planning consequences. The 2025 Annual Report&#8217;s investment programme is a management plan rather than a guaranteed outcome. Sustainable value creation requires delivery at acceptable costs, reliable assets and returns that exceed the cost of capital.<\/p>\n<p>Related: <a href=\"https:\/\/thestrategystory.com\/blog\/sse-business-model-in-2026\/\">Business Model<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-business-strategy-in-2026\/\">Business Strategy<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/\">SWOT<\/a> | <a href=\"https:\/\/thestrategystory.com\/blog\/sse-pestel-analysis-in-2026\/\">PESTEL<\/a><\/p>\n<p><h3>The Cost of Capital Test<\/h3>\n<p>Regulated assets can provide revenue visibility, but the allowed return must be sufficient relative to financing costs and execution risk. SSE&#8217;s adjusted net debt and hybrid capital rose in 2024\/25 as investment accelerated. A project may be strategically important for the energy system yet unattractive to shareholders if costs exceed the regulatory allowance or commissioning is delayed. Management should evaluate interest-rate sensitivity, cash requirements and downside returns. Long-term infrastructure growth should be judged by value creation after funding costs rather than capital expenditure alone.<\/p>\n<h3>Why Adjusted Profit Requires Caution<\/h3>\n<p>Adjusted operating profit was \u00a32.419 billion in 2024\/25, while reported operating profit was \u00a31.962 billion. The difference reflects SSE&#8217;s specified accounting adjustments, including fair-value effects. Both numbers are useful but answer different questions. A flat adjusted profit trend does not mean statutory earnings were unchanged. Investors should also distinguish one-off network cost recoveries from recurring allowed revenues. A rigorous SWOT considers the quality and predictability of earnings, not simply the size of the most favourable metric.<\/p>\n<h3>Construction and Supply Chain Dependencies<\/h3>\n<p>Electricity transmission projects require specialist cables, transformers, substations, planning approvals and skilled labour. Offshore wind construction adds vessels, turbines and difficult weather conditions. Supply shortages can delay commissioning, raise costs and defer expected returns. SSE&#8217;s Shetland HVDC and Viking projects demonstrate integrated infrastructure delivery, but past completion does not eliminate future risks. Contract structure, supplier resilience and contingency planning are central competitive capabilities. Management should monitor schedule performance, budget changes and the timing of operational handover.<\/p>\n<h3>Climate Transition Is Not a One-Way Opportunity<\/h3>\n<p>Decarbonisation supports investment in networks and renewables, yet the transition can create uncertainty around technology, regulation and customer costs. Thermal generation may remain necessary for flexibility while facing emissions-related constraints. Renewable output depends on weather, and new grid assets require local consent. SSE must balance system reliability, environmental performance and affordability. A credible transition strategy recognises these trade-offs rather than treating every low-carbon investment as automatically profitable or risk-free.<\/p>\n<h3>A Downside Scenario for SSE<\/h3>\n<p>Consider simultaneous offshore construction delays, higher interest rates and weaker renewable output. Cash expenditure could continue while commissioning and electricity revenues are deferred. Networks may provide more stable earnings, but regulatory cost recovery can lag spending. Thermal profitability may not offset these pressures if commodity spreads are subdued. This scenario is illustrative rather than a forecast. It shows why liquidity, staggered projects and realistic capital budgets are important. SSE&#8217;s strengths are most valuable when they help the company withstand multiple pressures at once.<\/p>\n<h3>Assessing Resilience Beyond Earnings<\/h3>\n<p>SSE&#8217;s ability to withstand difficult conditions depends on more than reported profit. Regulated asset growth, project schedules, debt maturity, interest costs and operational reliability interact over time. The company must preserve sufficient financing capacity to continue construction when market conditions weaken. Renewable projects can deliver valuable generation after commissioning, but delays defer revenues while capital costs continue. Networks offer longer-term regulatory visibility, though allowed returns and cost recovery are subject to oversight. Investors should examine these drivers together, using both adjusted and statutory figures, before assuming that electricity infrastructure growth guarantees shareholder returns.<\/p>\n<p><strong>Source:<\/strong> <a href=\"https:\/\/www.sse.com\/media\/qqtiamkh\/sse_ar25_interactive_pdf.pdf\">SSE Annual Report 2025<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SSE SWOT analysis in 2026 based on its 2025 Annual Report, covering electricity networks, renewables, debt, regulation and energy transition risks.<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[111],"tags":[],"class_list":{"0":"post-26996","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-swot-analysis"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>SSE SWOT Analysis in 2026: Strengths, Weaknesses, Opportunities and Threats - The Strategy Story<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SSE SWOT Analysis in 2026: Strengths, Weaknesses, Opportunities and Threats - The Strategy Story\" \/>\n<meta property=\"og:description\" content=\"SSE SWOT analysis in 2026 based on its 2025 Annual Report, covering electricity networks, renewables, debt, regulation and energy transition risks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"The Strategy Story\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-05T04:08:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thestrategystory.com\/blog\/wp-content\/uploads\/2026\/03\/TSS-logo-11-modified.png\" \/>\n\t<meta property=\"og:image:width\" content=\"403\" \/>\n\t<meta property=\"og:image:height\" content=\"403\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Shikhar Goel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Shikhar Goel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/\",\"url\":\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/\",\"name\":\"SSE SWOT Analysis in 2026: Strengths, Weaknesses, Opportunities and Threats - The Strategy Story\",\"isPartOf\":{\"@id\":\"https:\/\/thestrategystory.com\/blog\/#website\"},\"datePublished\":\"2026-11-05T04:08:27+00:00\",\"dateModified\":\"2026-11-05T04:08:27+00:00\",\"author\":{\"@id\":\"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/8eed62769b0125006923a7fdc33f1071\"},\"breadcrumb\":{\"@id\":\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/thestrategystory.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SSE SWOT Analysis in 2026: Strengths, Weaknesses, Opportunities and Threats\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/thestrategystory.com\/blog\/#website\",\"url\":\"https:\/\/thestrategystory.com\/blog\/\",\"name\":\"The Strategy Story\",\"description\":\"Simplifying Business Strategies\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/thestrategystory.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/8eed62769b0125006923a7fdc33f1071\",\"name\":\"Shikhar Goel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8b6c6c1213b8835c1731c5d95c1ea3103684847f09cc6d1aab64d3e432f66481?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8b6c6c1213b8835c1731c5d95c1ea3103684847f09cc6d1aab64d3e432f66481?s=96&d=mm&r=g\",\"caption\":\"Shikhar Goel\"},\"url\":\"https:\/\/thestrategystory.com\/blog\/author\/tss-publisher\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"SSE SWOT Analysis in 2026: Strengths, Weaknesses, Opportunities and Threats - The Strategy Story","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/","og_locale":"en_US","og_type":"article","og_title":"SSE SWOT Analysis in 2026: Strengths, Weaknesses, Opportunities and Threats - The Strategy Story","og_description":"SSE SWOT analysis in 2026 based on its 2025 Annual Report, covering electricity networks, renewables, debt, regulation and energy transition risks.","og_url":"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/","og_site_name":"The Strategy Story","article_published_time":"2026-11-05T04:08:27+00:00","og_image":[{"width":403,"height":403,"url":"https:\/\/thestrategystory.com\/blog\/wp-content\/uploads\/2026\/03\/TSS-logo-11-modified.png","type":"image\/png"}],"author":"Shikhar Goel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Shikhar Goel","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/","url":"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/","name":"SSE SWOT Analysis in 2026: Strengths, Weaknesses, Opportunities and Threats - The Strategy Story","isPartOf":{"@id":"https:\/\/thestrategystory.com\/blog\/#website"},"datePublished":"2026-11-05T04:08:27+00:00","dateModified":"2026-11-05T04:08:27+00:00","author":{"@id":"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/8eed62769b0125006923a7fdc33f1071"},"breadcrumb":{"@id":"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/thestrategystory.com\/blog\/sse-swot-analysis-in-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/thestrategystory.com\/blog\/"},{"@type":"ListItem","position":2,"name":"SSE SWOT Analysis in 2026: Strengths, Weaknesses, Opportunities and Threats"}]},{"@type":"WebSite","@id":"https:\/\/thestrategystory.com\/blog\/#website","url":"https:\/\/thestrategystory.com\/blog\/","name":"The Strategy Story","description":"Simplifying Business Strategies","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thestrategystory.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/8eed62769b0125006923a7fdc33f1071","name":"Shikhar Goel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8b6c6c1213b8835c1731c5d95c1ea3103684847f09cc6d1aab64d3e432f66481?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8b6c6c1213b8835c1731c5d95c1ea3103684847f09cc6d1aab64d3e432f66481?s=96&d=mm&r=g","caption":"Shikhar Goel"},"url":"https:\/\/thestrategystory.com\/blog\/author\/tss-publisher\/"}]}},"_links":{"self":[{"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/posts\/26996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/comments?post=26996"}],"version-history":[{"count":2,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/posts\/26996\/revisions"}],"predecessor-version":[{"id":27001,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/posts\/26996\/revisions\/27001"}],"wp:attachment":[{"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/media?parent=26996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/categories?post=26996"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/tags?post=26996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}