{"id":26281,"date":"2026-09-21T07:59:30","date_gmt":"2026-09-21T07:59:30","guid":{"rendered":"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/"},"modified":"2026-09-22T11:27:43","modified_gmt":"2026-09-22T11:27:43","slug":"ge-vernova-business-model-2026","status":"publish","type":"post","link":"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/","title":{"rendered":"GE Vernova Business Model 2026: How Does GE Vernova Make Money?"},"content":{"rendered":"<p>GE Vernova\u2019s business model in 2026 is built around a simple but unusually powerful economic loop: sell the equipment required to generate and move electricity, then monetize much of that equipment for years or decades through services. In 2025, GE Vernova generated $38.1 billion of revenue, including $20.9 billion from equipment and $17.1 billion from services. Orders reached $59.3 billion and backlog increased 26% to $150.2 billion.<\/p>\n<p>Those figures reveal why GE Vernova should not be viewed merely as an industrial manufacturer. Equipment creates installed base; installed base creates service demand; services generate cash that can be reinvested into capacity and technology; and the resulting product improvements create the next generation of equipment sales. The company already has more than 7,000 gas turbines and 59,000 wind turbines installed, while its services backlog alone is approximately $86 billion.<\/p>\n<p>The second engine is Electrification. As electricity demand grows from AI data centers, manufacturing and broader electrification, the bottleneck increasingly shifts from generating electrons to moving and controlling them. GE Vernova\u2019s grid equipment backlog has more than quadrupled to roughly $35 billion in four years. This gives the company exposure to electricity growth regardless of whether the incremental generation source is gas, nuclear, wind or another technology.<\/p>\n<h2>The Industry Problem GE Vernova Solves<\/h2>\n<p>The global electricity system faces three simultaneous requirements: more power, greater reliability and lower carbon intensity. These objectives can conflict. Renewable generation can reduce emissions but increases the need for grid investment and balancing capacity. AI data centers need enormous quantities of reliable electricity quickly. Aging grids require transformers, switchgear and transmission investment before new generation can reach customers.<\/p>\n<p>GE Vernova\u2019s breadth addresses this system problem. Power supplies dispatchable generation through gas, nuclear, steam and hydro technologies. Wind supplies renewable generation. Electrification provides grid equipment, power conversion, storage and software. The portfolio therefore spans generation and transmission rather than depending on a single energy technology.<\/p>\n<p>The economic advantage is diversification across the electricity system. A gas turbine order and a transformer order can be driven by the same underlying increase in electricity demand. Renewable penetration can create wind demand while simultaneously increasing demand for grid modernization and flexible gas generation. Different technologies can therefore reinforce rather than simply cannibalize one another.<\/p>\n<p><em>Related: <a href=\"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-strategy-2026\/\">GE Vernova Business Strategy in 2026<\/a><\/em><\/p>\n<h2>How the Power Equipment Industry Creates Value<\/h2>\n<p>Large power equipment has long product cycles, demanding qualification requirements and significant consequences of failure. Customers are not purchasing generic machines; they are underwriting assets expected to operate for decades. This creates barriers around engineering know-how, installed performance, manufacturing capability and service infrastructure.<\/p>\n<p>The sale of equipment is only the first layer of value. Gas turbines require parts, upgrades and maintenance throughout their operating lives. Wind turbines create service and repowering opportunities. Grid equipment requires modernization as loads and network architectures evolve. The installed base therefore functions like a distribution network for future services.<\/p>\n<p>Backlog adds another dimension. GE Vernova ended 2025 with $150.2 billion of remaining performance obligations, almost four times annual revenue. Backlog does not equal immediate cash, but it gives unusually strong visibility into future production and services. More importantly, management said equipment margins embedded in backlog improved significantly, meaning the quality of future revenue may be improving alongside quantity.<\/p>\n<p><em>Related: <a href=\"https:\/\/thestrategystory.com\/blog\/ge-vernova-swot-analysis-2026\/\">GE Vernova SWOT Analysis in 2026<\/a><\/em><\/p>\n<h2>GE Vernova Business Model: Three Complementary Segments<\/h2>\n<h3>Power: installed-base economics around dispatchable generation<\/h3>\n<p>Power generated $19.8 billion of 2025 revenue, up 9%, with $32.8 billion of orders and $94.4 billion of backlog. EBITDA reached $2.9 billion and margin expanded to 14.7% from 12.5%. Power is therefore both GE Vernova\u2019s largest segment and its strongest current profit pool.<\/p>\n<p>Gas Power is central. GE Vernova\u2019s installed base of more than 7,000 gas turbines creates a large recurring services opportunity. New turbine sales expand future service potential, while the existing fleet creates parts, repair and upgrade demand independent of annual new-unit shipments. This makes the lifetime economics of a turbine more valuable than its original equipment margin alone.<\/p>\n<p>AI reinforces this model. Data centers need power quickly and at high reliability. Gas can provide dispatchable generation while grids and longer-duration technologies are built. GE Vernova can then participate in future transitions through nuclear, carbon capture and grid equipment. The customer relationship can therefore outlive any one generation technology.<\/p>\n<h3>Electrification: monetizing the grid bottleneck<\/h3>\n<p>Electrification generated $9.6 billion of revenue in 2025, up 28%, while orders rose 23% to $19.3 billion. EBITDA more than doubled to $1.43 billion and margin expanded from 9.0% to 14.9%. Backlog increased 48% to $34.7 billion.<\/p>\n<p>This is strategically significant because every form of new generation eventually needs grid infrastructure. Transformers, switchgear, substations, HVDC systems and power conversion equipment are required whether the electrons originate from gas, wind, nuclear or another source. Electrification is therefore GE Vernova\u2019s technology-agnostic exposure to the electricity supercycle.<\/p>\n<p>The margin expansion also suggests scale is improving economics rather than simply increasing volume. When demand exceeds manufacturing capacity for critical grid equipment, disciplined pricing and better factory utilization can increase profitability. GE Vernova is investing to expand capacity while using lean to extract more output from existing footprints.<\/p>\n<h3>Wind: strategic relevance with challenged economics<\/h3>\n<p>Wind generated $9.1 billion of revenue in 2025, down 6%, and EBITDA remained negative at $598 million. Orders rose 8% to $7.7 billion, while backlog declined 5% to $21.6 billion. Wind therefore illustrates an important feature of GE Vernova\u2019s model: not every decarbonization market automatically creates attractive economics.<\/p>\n<p>Management is responding by emphasizing workhorse products, better underwriting, repowering, services and execution of offshore backlog. The objective is not volume at any price. It is to convert a strategically important installed base into acceptable returns.<\/p>\n<p><em>Related: <a href=\"https:\/\/thestrategystory.com\/blog\/ge-vernova-pestel-analysis-2026\/\">GE Vernova PESTEL Analysis in 2026<\/a><\/em><\/p>\n<h2>How Does GE Vernova Make Money?<\/h2>\n<p>GE Vernova makes money through two broad revenue streams: equipment and services. Equipment contributed $20.9 billion in 2025, or roughly 55% of revenue, while services contributed $17.1 billion, about 45%. The near balance is important. GE Vernova is not dependent solely on winning new megaprojects every year because a large portion of revenue comes from supporting equipment already operating.<\/p>\n<p>Equipment economics differ by segment. Gas turbines and grid products are benefiting from strong demand and better pricing. Wind economics remain more difficult because project execution, supply chains and policy can overwhelm headline demand. The company\u2019s emphasis on underwriting is therefore a business-model discipline: a dollar of backlog is valuable only if contractual price adequately compensates for execution risk.<\/p>\n<p>Services typically carry attractive economics because GE Vernova possesses proprietary engineering knowledge, parts and operating data for its installed fleet. The $86 billion services backlog provides long-duration visibility. Each new equipment sale can enlarge this pool, creating a flywheel between current equipment growth and future recurring revenue.<\/p>\n<h2>The Installed Base Is GE Vernova\u2019s Hidden Distribution Asset<\/h2>\n<p>GE Vernova technologies help generate approximately 25% of global electricity. This scale matters because installed equipment creates customer access that a new entrant cannot quickly replicate. Utilities are risk-averse when dealing with mission-critical assets. A supplier that has operated equipment safely for decades possesses relationships, data and service infrastructure that can influence future purchasing decisions.<\/p>\n<p>The installed base also produces proprietary operational data. Management plans to combine this data with AI to improve engineering, service and customer outcomes. If successful, data can deepen the moat: more installed equipment produces more operating information, which can improve service quality and product design, supporting further equipment wins.<\/p>\n<h2>Backlog Converts Demand Into Multi-Year Revenue Visibility<\/h2>\n<p>Orders of $59.3 billion exceeded 2025 revenue by more than $21 billion, driving backlog to $150.2 billion. Power backlog increased 29% to $94.4 billion and Electrification backlog increased 48% to $34.7 billion. This indicates demand is accumulating faster than GE Vernova can currently recognize it as revenue.<\/p>\n<p>That creates opportunity and responsibility. Backlog supports visibility, but it also creates execution obligations. Long-cycle contracts expose GE Vernova to labor, materials and project risks. Management\u2019s focus on better underwriting matters because historical industrial businesses often destroyed value by booking large orders at inadequate margins.<\/p>\n<p>Improving backlog margin changes the economic quality of growth. Capacity expansion should translate not only into higher revenue but into better incremental profit if contracts were priced appropriately.<\/p>\n<h2>Financial Analysis of GE Vernova\u2019s Business Model<\/h2>\n<p>Revenue increased 9% to $38.1 billion in 2025, but adjusted EBITDA rose much faster, from $2.0 billion to $3.2 billion. Adjusted EBITDA margin expanded from 5.8% to 8.4%, while free cash flow more than doubled to $3.7 billion. This gap between revenue growth and profit growth suggests the company is moving beyond simple volume expansion toward better operating economics.<\/p>\n<p>Power and Electrification explain much of the improvement. Power EBITDA margin rose 220 basis points to 14.7%. Electrification expanded by 590 basis points to 14.9%. Wind remained the major drag at negative 6.6%. The portfolio therefore contains two increasingly profitable engines and one segment requiring structural improvement.<\/p>\n<p>Services are central to cash generation. Long-duration service contracts and parts demand can produce cash with less dependence on new equipment cycles. Management explicitly expects the high-margin services backlog to generate free cash flow that can be reinvested organically.<\/p>\n<h2>Capacity Is Becoming a Competitive Advantage<\/h2>\n<p>Strong demand means manufacturing throughput can determine market share. GE Vernova plans $11 billion of capex and R&amp;D from 2025 through 2028. It hired more than 1,500 incremental U.S. production workers in Power and Electrification in 2025, added shifts and is investing in factories across multiple regions.<\/p>\n<p>The company is also using lean, robotics and automation to increase output from existing facilities. This matters because greenfield factories take time and capital. Raising throughput from the existing footprint can produce faster returns and reduce the capital intensity of growth.<\/p>\n<p>Management\u2019s idea that factories must \u201cearn the right\u201d to receive future capex is strategically disciplined. Capital goes to sites that demonstrate lean execution, aligning investment with operating capability rather than simply with demand forecasts.<\/p>\n<h2>Capital Allocation Reinforces the Core Business Model<\/h2>\n<p>GE Vernova generated approximately $2.5 billion from completed or announced dispositions since the spin, simplifying the portfolio with limited financial trade-offs. It is redeploying capital into faster-growing core areas, including Woodward\u2019s combustion parts business and the remaining stake in Prolec GE.<\/p>\n<p>The logic is portfolio concentration. Combustion parts strengthen Gas Power supply and service economics. Prolec expands transformer capacity precisely when grid equipment is constrained. These transactions deepen existing profit pools rather than create unrelated diversification.<\/p>\n<p>At the same time, GE Vernova returned $3.6 billion to shareholders in 2025 and increased its buyback authorization. The company is trying to balance organic investment, targeted M&amp;A and distributions while maintaining financial strength.<\/p>\n<h2>Strategic Outlook of the GE Vernova Business Model<\/h2>\n<p>The strongest feature of GE Vernova\u2019s model is that it participates across the electricity value chain while monetizing assets over long lives. The electricity supercycle drives new equipment; new equipment enlarges installed base; installed base creates services; services generate cash; cash funds capacity and innovation.<\/p>\n<p>Electrification may increasingly change the mix. Its equipment backlog has quadrupled in four years and management expects it to double again by 2028. Because grid spending is required across generation technologies, this business reduces dependence on predicting which energy source wins.<\/p>\n<p>The major challenge is execution. A $150 billion backlog is valuable only if equipment is delivered safely, on time and at attractive margins. Wind demonstrates how strong end-market narratives can coexist with poor economics. GE Vernova\u2019s long-term value therefore depends less on maximizing orders than on converting the right orders into cash.<\/p>\n<p>In 2026, the business model can best be understood as an installed-base and backlog compounding system positioned inside a multi-decade electricity buildout. GE Vernova sells the machines that generate and move electricity, but the deeper economics come from what happens after the equipment is installed: decades of service, upgrades, data and repeat customer relationships.<\/p>\n<h2>Why Equipment Mix Matters to GE Vernova\u2019s Economics<\/h2>\n<p>GE Vernova\u2019s equipment portfolio also has an important portfolio effect. Power, Wind and Electrification do not move in perfect synchronization, so investment can migrate between technologies without eliminating the company\u2019s opportunity. A market that slows renewable additions may still need gas capacity or grid reinforcement; a market accelerating renewables can create additional transmission and balancing requirements. This reduces the strategic cost of being wrong about one specific generation forecast.<\/p>\n<p>Mix also determines margin. A company can grow revenue rapidly while destroying value if growth comes from poorly priced, highly customized projects. GE Vernova\u2019s improving Power and Electrification margins indicate that current growth is increasingly concentrated in businesses where demand, pricing and execution are more favorable. Wind provides the counterexample and explains management\u2019s emphasis on selectivity.<\/p>\n<p>That is why the company\u2019s business model should be assessed through profitable backlog rather than orders alone. A high-quality order should create acceptable equipment margin today, future service opportunities tomorrow and a customer relationship that can support additional products. This lifetime-value perspective is more useful than judging GE Vernova simply by annual equipment shipments.<\/p>\n<h2>Customer Relationships Create a Second Barrier to Entry<\/h2>\n<p>Utilities, independent power producers, data-center developers and industrial customers make decisions where reliability failures can have enormous economic consequences. Supplier credibility therefore matters. GE Vernova\u2019s decades of operating history, engineering references and field-service presence lower perceived customer risk in a way that a lower-priced new entrant may struggle to match.<\/p>\n<p>The relationship can broaden over time. A utility buying a gas turbine may later require service upgrades, grid equipment or software. A hyperscaler initially purchasing switchgear can eventually need generation and power-conversion solutions. GE Vernova\u2019s portfolio creates multiple entry points into the same customer capital program.<\/p>\n<p>This does not guarantee cross-selling, because purchasing decisions can be decentralized and competitive. But the installed relationship reduces customer-acquisition friction and gives GE Vernova insight into future infrastructure requirements. In a market constrained by lead times, being involved early in customer planning can itself become commercially valuable.<\/p>\n<p><strong>Source:<\/strong> GE Vernova, <a href=\"https:\/\/www.gevernova.com\/investors\/annual-report\" target=\"_blank\" rel=\"noopener\">2025 Annual Report<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>GE Vernova business model in 2026 explains how Power, Wind, Electrification, equipment, installed base and long-term services generate revenue and cash flow.<\/p>\n","protected":false},"author":3,"featured_media":26302,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[166],"tags":[],"class_list":{"0":"post-26281","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-business-model"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>GE Vernova Business Model 2026: How Does GE Vernova Make Money? - The Strategy Story<\/title>\n<meta name=\"description\" content=\"GE Vernova business model in 2026 explains how Power, Wind, Electrification, equipment, installed base and long-term services generate revenue and cash flow.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GE Vernova Business Model 2026: How Does GE Vernova Make Money? - The Strategy Story\" \/>\n<meta property=\"og:description\" content=\"GE Vernova business model in 2026 explains how Power, Wind, Electrification, equipment, installed base and long-term services generate revenue and cash flow.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"The Strategy Story\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-21T07:59:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-22T11:27:43+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/thestrategystory.com\/blog\/wp-content\/uploads\/2026\/09\/matthew-henry-yETqkLnhsUI-unsplash.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"640\" \/>\n\t<meta property=\"og:image:height\" content=\"427\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Shikhar Goel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Shikhar Goel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/\",\"url\":\"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/\",\"name\":\"GE Vernova Business Model 2026: How Does GE Vernova Make Money? - The Strategy Story\",\"isPartOf\":{\"@id\":\"https:\/\/thestrategystory.com\/blog\/#website\"},\"datePublished\":\"2026-09-21T07:59:30+00:00\",\"dateModified\":\"2026-09-22T11:27:43+00:00\",\"author\":{\"@id\":\"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/8eed62769b0125006923a7fdc33f1071\"},\"description\":\"GE Vernova business model in 2026 explains how Power, Wind, Electrification, equipment, installed base and long-term services generate revenue and cash flow.\",\"breadcrumb\":{\"@id\":\"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/thestrategystory.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"GE Vernova Business Model 2026: How Does GE Vernova Make Money?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/thestrategystory.com\/blog\/#website\",\"url\":\"https:\/\/thestrategystory.com\/blog\/\",\"name\":\"The Strategy Story\",\"description\":\"Simplifying Business Strategies\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/thestrategystory.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/8eed62769b0125006923a7fdc33f1071\",\"name\":\"Shikhar Goel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8b6c6c1213b8835c1731c5d95c1ea3103684847f09cc6d1aab64d3e432f66481?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8b6c6c1213b8835c1731c5d95c1ea3103684847f09cc6d1aab64d3e432f66481?s=96&d=mm&r=g\",\"caption\":\"Shikhar Goel\"},\"url\":\"https:\/\/thestrategystory.com\/blog\/author\/tss-publisher\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"GE Vernova Business Model 2026: How Does GE Vernova Make Money? - The Strategy Story","description":"GE Vernova business model in 2026 explains how Power, Wind, Electrification, equipment, installed base and long-term services generate revenue and cash flow.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/","og_locale":"en_US","og_type":"article","og_title":"GE Vernova Business Model 2026: How Does GE Vernova Make Money? - The Strategy Story","og_description":"GE Vernova business model in 2026 explains how Power, Wind, Electrification, equipment, installed base and long-term services generate revenue and cash flow.","og_url":"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/","og_site_name":"The Strategy Story","article_published_time":"2026-09-21T07:59:30+00:00","article_modified_time":"2026-09-22T11:27:43+00:00","og_image":[{"width":640,"height":427,"url":"http:\/\/thestrategystory.com\/blog\/wp-content\/uploads\/2026\/09\/matthew-henry-yETqkLnhsUI-unsplash.jpg","type":"image\/jpeg"}],"author":"Shikhar Goel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Shikhar Goel","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/","url":"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/","name":"GE Vernova Business Model 2026: How Does GE Vernova Make Money? - The Strategy Story","isPartOf":{"@id":"https:\/\/thestrategystory.com\/blog\/#website"},"datePublished":"2026-09-21T07:59:30+00:00","dateModified":"2026-09-22T11:27:43+00:00","author":{"@id":"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/8eed62769b0125006923a7fdc33f1071"},"description":"GE Vernova business model in 2026 explains how Power, Wind, Electrification, equipment, installed base and long-term services generate revenue and cash flow.","breadcrumb":{"@id":"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/thestrategystory.com\/blog\/ge-vernova-business-model-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/thestrategystory.com\/blog\/"},{"@type":"ListItem","position":2,"name":"GE Vernova Business Model 2026: How Does GE Vernova Make Money?"}]},{"@type":"WebSite","@id":"https:\/\/thestrategystory.com\/blog\/#website","url":"https:\/\/thestrategystory.com\/blog\/","name":"The Strategy Story","description":"Simplifying Business Strategies","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thestrategystory.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/8eed62769b0125006923a7fdc33f1071","name":"Shikhar Goel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thestrategystory.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8b6c6c1213b8835c1731c5d95c1ea3103684847f09cc6d1aab64d3e432f66481?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8b6c6c1213b8835c1731c5d95c1ea3103684847f09cc6d1aab64d3e432f66481?s=96&d=mm&r=g","caption":"Shikhar Goel"},"url":"https:\/\/thestrategystory.com\/blog\/author\/tss-publisher\/"}]}},"_links":{"self":[{"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/posts\/26281","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/comments?post=26281"}],"version-history":[{"count":3,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/posts\/26281\/revisions"}],"predecessor-version":[{"id":26388,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/posts\/26281\/revisions\/26388"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/media\/26302"}],"wp:attachment":[{"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/media?parent=26281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/categories?post=26281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thestrategystory.com\/blog\/wp-json\/wp\/v2\/tags?post=26281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}